Our products are applied in many fields.
Overview
Quick Information
- Relevant Industries:
-
Manufacturing Plant
- Manufacturer Title:
-
OEM
- OEM Support:
-
Help
- Tolerance:
-
.01-.05mm or Personalized
- Certification:
-
ISO9001, SGS
- Surface area Remedy:
-
Sandblasting,Sprucing,Anodize, Zinc,Nickel,Chrome,Plating, etc.
- Software:
-
Auto,Healthcare Equipments,Electric powered Equipment,Hardware,etc.
- Dimension:
-
As Customers’ Request
- Products:
-
Milling/Lathe/Drilling/4/3 Axis CNC Machining Middle
- Drawing Format:
-
Professional/E, Auto CAD, Reliable Functions,IGS,UG, CAD/CAM/CAE
Source Ability
- Supply Ability:
- ten thousand Piece/Pieces for each Month
Packaging & Delivery
- Port
- Ningbo, Shanghai
-
Guide Time
: -
Quantity(Bags) 1 – 500 >500 Est. Time(times) 30 To be negotiated
On-line Customization
Custom made Anodized cnc machined elements automobile automobile part
Product Description
Product Type | CNC turning, milling, drilling, grinding, wire EDM cutting and so forth. |
Our Providers | CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Generating,and so on |
Material | Aluminum,Brass,Stainless Metal,Copper,Plastic,Wood,Silicone,Rubber,Or as per the customers’ requirements |
Surface Treatment |
Anodizing,Sandblasting,Portray,Powder coating,Plating,Silk Printing,Brushing,Polishing,Laser Engraving |
Dimension | As customers’ request |
Service Undertaking | To give production style, creation and specialized services, mould development and processing, and so on |
Drawing Structure: | PRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE |
Testing Machine | Digital Height Gauge, caliper, Coordinate measuring equipment, projection device, roughness tester, hardness tester and so on |
Industry employed | Machinery large responsibility products digital device Car spare elements optical telecommunication |
Packing | Eco-welcoming pp bag / EPE Foam /Carton boxes or wooden boxes As customer’s specific requirements |
Trial sample time | 7-ten times following confirmation |
Delivery time | 7-thirty times after receive the pre-payments |
Payment Conditions | T/T,Western Union,Paypal |
OEM Provider
OEM Elements
Surface Treatment method
Production Method
Why Us